Professional installation and turnkey setup services for UAE projects. Same-day delivery, complete site preparation, air distribution systems, and compliance certification for Abu Dhabi, Dubai, and across the Emirates.
Complete step-by-step installation process from site survey to commissioning
Understanding noise regulations and compliance requirements across UAE emirates for air compressor installations
Common installation and setup questions for UAE air compressor projects
Minimum 3x3 meters clearance around compressor for ventilation and maintenance access. Additional space for fuel tank, air receiver, and distribution manifold. Consider crane access for delivery and positioning.
General limit 55 dB during day (7 AM - 10 PM) in residential areas. Construction activities typically 65 dB maximum. Use acoustic enclosures or locate >50 meters from noise-sensitive areas. Evening/weekend restrictions apply.
Construction sites typically covered under main building permit. Standalone installations may require noise permit from Dubai Municipality. Industrial areas have fewer restrictions. Check with local authorities for specific requirements.
415V 3-phase supply most common for >15 HP units. Include motor starter, overload protection, isolator switch. Ensure proper earthing system. Cable sizing based on motor current and distance. Local electrician required for connections.
Site preparation, delivery, installation, air distribution, testing, and operator training across UAE.