Novel Technical Services
🚀 PROFESSIONAL DELIVERY SERVICES

Fast & Professional Generator Delivery Across The UAE

Same-day delivery and professional installation services across Abu Dhabi, Dubai and all UAE emirates. Complete turnkey solutions with crane services, site preparation, and electrical commissioning.

4-8
Hours Delivery
100%
Setup Included
7
Emirates Covered

🔧 Complete Installation Package

Everything included for immediate power solution

🚚
Same Day Delivery
Abu Dhabi & Dubai priority zones
Professional Installation
Licensed technicians & full setup
🏗️
Crane Services
Heavy lifting & positioning support
📋
Site Preparation
Complete guidance & coordination

How Does Novel Technical Services Handle Generator Delivery & Installation in the UAE?

Follow the complete delivery and installation process from order confirmation to generator commissioning

1
Order Confirmation
2
Site Survey
3
Logistics Planning
4
Delivery & Setup
5
Commissioning

📋 Order Confirmation & Documentation

Complete project assessment and equipment specification verification to ensure optimal generator selection for your UAE project requirements.

📊 Technical Specifications
  • Power requirement analysis (kVA/kW)
  • Load schedule verification
  • Fuel type and consumption calculation
  • Environmental conditions assessment
  • Operating hours and duty cycle
📍 Site Information
  • Delivery address and GPS coordinates
  • Site access route assessment
  • Installation location confirmation
  • Electrical connection requirements
  • Municipality permit requirements
📅 Project Timeline
  • Rental start date confirmation
  • Installation deadline requirements
  • Project duration and milestones
  • Maintenance schedule planning
  • Emergency contact information

🔍 Site Survey & Preparation Assessment

Professional site assessment to identify requirements, challenges, and optimal installation approach for your UAE location.

🏗️ Physical Assessment
  • Foundation and ground conditions
  • Space clearance measurements
  • Access route for delivery vehicles
  • Crane requirements for positioning
  • Ventilation and airflow assessment
⚡ Electrical Infrastructure
  • Main distribution panel location
  • Cable routing and conduit planning
  • Earthing system requirements
  • Control panel positioning
  • Load testing preparation
⛽ Fuel System Planning
  • Fuel tank sizing and placement
  • Fuel line routing and connections
  • Spill containment measures
  • Fuel delivery access point
  • Environmental compliance check

📦 Logistics Planning & Resource Allocation

Comprehensive logistics coordination including transportation, equipment, personnel, and timeline optimization for UAE delivery.

🚛 Transportation Planning
  • Specialized transport vehicle selection
  • Route optimization and traffic planning
  • Permit coordination for oversized loads
  • Escort vehicle arrangement if required
  • Delivery time slot confirmation
🏗️ Equipment & Personnel
  • Crane and lifting equipment booking
  • Certified technician assignment
  • Tools and testing equipment preparation
  • Safety equipment and PPE coordination
  • Installation materials and accessories
📋 Coordination & Communication
  • Customer notification and confirmation
  • Site contact person coordination
  • Weather conditions monitoring
  • Alternative delivery date planning
  • Final checklist review and approval

🚚 Delivery & Physical Installation

Professional delivery and mechanical installation with specialized equipment and certified technicians across UAE locations.

📦 Delivery & Positioning
  • Generator delivery and inspection
  • Crane operation and positioning
  • Foundation alignment and leveling
  • Vibration isolation installation
  • Securing and weatherproofing
⚡ Electrical Connections
  • Main power cable installation
  • Control cable connections
  • Earthing system installation
  • Circuit breaker setup
  • Connection tightness verification
⛽ Fuel System Setup
  • Fuel lines and connections
  • Fuel pump and filtration system
  • Tank setup and fuel filling
  • Leak testing and inspection
  • Environmental protection measures

✅ Commissioning & Handover

Complete system commissioning, testing, and operator training to ensure reliable generator operation for your UAE project.

🔧 System Testing
  • Initial startup and operation check
  • Load bank testing (25%, 50%, 100%)
  • Automatic transfer switch testing
  • Protection system verification
  • Performance parameter recording
📚 Documentation & Training
  • Operator manual and documentation
  • Basic operation training
  • Emergency procedures explanation
  • Maintenance schedule overview
  • Contact information for support
📋 Project Completion
  • Installation completion certificate
  • Performance test report
  • Warranty registration
  • Customer satisfaction confirmation
  • Maintenance service scheduling

How Fast Can Novel Technical Services Deliver Generators Across UAE?

Comprehensive delivery network covering all UAE emirates with specialized logistics for construction sites and industrial facilities

🏢
Abu Dhabi Central
4-8 Hours
Downtown, Business District, Government complexes, major construction projects
🏭
Musaffah Industrial
2-6 Hours
Industrial zones, manufacturing facilities, warehouses, logistics centers
🌆
Dubai & DIFC
8-12 Hours
Dubai city center, financial district, commercial towers, hotel projects
🏗️
Construction Sites
6-10 Hours
Active construction projects, infrastructure developments, residential complexes
🏘️
Northern Emirates
12-24 Hours
Sharjah, Ajman, Ras Al Khaimah, Fujairah, industrial and residential projects

🚛 Specialized Transport Capabilities

Heavy Duty Transport: Specialized vehicles for generators up to 2000kVA capacity
Crane Services: Mobile cranes from 5-ton to 50-ton capacity for positioning
Access Solutions: Narrow access specialists for confined urban construction sites
Permit Coordination: Oversized load permits and route clearance across UAE

What Generator Installation Methods Does Novel Technical Services Offer in UAE?

Choose the optimal installation approach based on your UAE project requirements, location constraints, and timeline

🚛
Ground Level Installation
Standard setup for most applications
Setup Time: 2-4 Hours
Generator Size: Up to 2000kVA
Foundation: Concrete/Gravel Pad
Access Required: Standard Vehicle
  • Direct truck delivery and positioning
  • Minimal lifting equipment required
  • Fastest installation method
  • Cost-effective for most projects
  • Easy maintenance access
  • Suitable for temporary installations
🏢
Confined Space Installation
Specialized urban site solutions
Setup Time: 6-12 Hours
Generator Size: Up to 750kVA
Foundation: Custom Engineered
Access Required: Specialized Equipment
  • Narrow access route navigation
  • Multi-stage positioning process
  • Custom rigging solutions
  • Ventilation system integration
  • Sound attenuation considerations
  • Complex urban installations

How Quickly Can NTS Install Emergency Power Generators in UAE?

Rapid deployment capabilities for urgent power requirements across UAE construction and industrial sites

🚨
Critical Power Failure
4-8 Hours
Immediate generator deployment for critical operations, hospitals, data centers, and essential services
Construction Emergency
6-12 Hours
Rapid deployment for construction site power outages, concrete curing, and time-critical project phases
🏭
Industrial Breakdown
8-16 Hours
Manufacturing and industrial facility backup power with specialized installation for production continuity
🌊
Weather Emergency
12-24 Hours
Storm and weather-related power outage response with weatherproof installations and protection